
DEPS
Depreciation simulation
avail.
NEWQ New quantity calculation
USED
Phys. sample no longer
exists
STRD Sample was stored
APRV Approved
PROG
Progress confirmation
(MST)
CROK
Certificate receipt
confirmed
LBPR Label printed
FMAI
FM account assignmt
incomplete
BCRQ
Order to be handled in
batches
BASC
Batch assignment
complete
SIG1
One dig. signature
missing
SIG2
Two dig. signatures
missing
SIG3
Three dig. signatures
missing
SIG4
Four dig. signatures
missing
POAR Part objects archived
APIP
Based on approved insp.
plan
EOPD
Ext. operatn partly
delivered
EODL
External operation
delivered
BRAR Batch record archived
SOAS Sales order assigned
LOLK
Lot locked for batch
record
SERM
SerialNo maintenance
required
BNAS Batch not assigned
IREP Under repair
TREP Partially repaired
REPA Repaired
BDRQ
Business decision
required
BDMD Business decision made
BRRQ Batch record required
NOCH Changes forbidden
CEFF
Effectivity parameter
copied
MADJ
Manual adjustment
necessary
RlNe
Release in network taken
place
Komentarze do niniejszej Instrukcji